6 February 2019:
All still working. We are still in testing and
dumping water – rather than running it all over the
wheel – at times of peak flows (like the melting of
the snow in the warm rain on Monday) so I don't have
a good idea of true peak output (this is because we
haven’t finished building up the leat walls to full
height to allow sending all the water over the
wheel).
Nonetheless max continuous output noted so far is
2.26kW and total generated power thus far since
commissioning on 10 December is 1.7MWh.
Editor: The standing wave in the launder is
intriguing. I thought perhaps it is created by the
wheel rather than the wind, but John Christmas
suggests it is due to the lip in the launder