Work started on 22 October 2018.  A local contractor 
							brought large scale pumping plant onto site and 
							moved and cleaned substantial mud and silt from the 
							two tunnels.  This allowed a good visual inspection 
							of the tunnels with little water.  From this I 
							prepared a repairs report for the owners, and a 
							report to SPAB, for gaining grant aid for the mud 
							clearance expenditure.  
							
							
							On 29 October there was further inspection to 
							establish the cause of the water leakage into areas 
							of the wheel chamber and next door below the mill 
							office floor.  Scale drawings were prepared (see 
							below) and technical advice was given by member Paul 
							Bracey.